Product lifecycle & the Maintainable gate
Every ANUKA product sits in exactly one lifecycle state. The state says who is responsible for the product’s quality: the builder lane, or the maintenance roles.
The states
Section titled “The states”| State | Meaning | Who is responsible |
|---|---|---|
building | No public MVP yet | Builder lane |
mvp | MVP live on production | Builder lane |
connected | MVP + ANUKA Auth (OAuth + agent-login) + Widget embedded + stage subdomain + version toggle | Builder lane |
maintainable | Passed the Maintainable gate; in the maintenance rotation | Maintenance roles |
growth | Maintainable + active growth sprints (features still land via sprints, integration via maintenance) | Roles + sprint lanes |
The states are also positions on the Tiger Flow
loop: building covers DRAFT → MODEL → RESOURCE → TEAM; mvp is the first
PRODUCT; connected is PRODUCT wired into the platform; maintainable is
the loop running continuously PRODUCT → MARKET → VALUE → KB under the
maintainers; growth is the MARKET and VALUE arcs expanding.
The Maintainable gate
Section titled “The Maintainable gate”A product enters the operational level only when all of these are true:
- MVP live on production; a stage environment exists and is the current build.
- ANUKA Auth connected (sign-in works, participant + guest verified); the ANUKA Widget is embedded and posting works.
- Roadmap v1 exists in ANUKA — product goal, current status per area, known issues listed, next milestones — plus the product’s collaboration schema (state and links, position on the Tiger Flow with a status per stage, the seven roles for this product, where each queue lives, the feedback route, the release route, the escalation path). Roadmap v1 is Tiger Flow-shaped: a status, a current output and a next step for every cycle stage. It is created by the builder as the handover deliverable.
- The version toggle PROD ↔ PREVIEW works for participants; the founder account defaults to stage.
- Error monitoring is connected (Sentry or the contour equivalent) and an uptime probe runs in the widget-roadmap loop.
- A BDD baseline exists in
anuka-platform-design-storiesfor the main journey. - A handover record sits in the product’s ANUKA goal: the builder signs, White Tiger accepts.
After the gate
Section titled “After the gate”- The builder lane stops being the product’s supervisor. It may still take sprint tasks on the product, but it no longer owns the product’s quality, statuses, or releases.
- The product enters every maintainer role’s rotation queue: each role audits it at least once per two weeks; products with open P1s or a recent release are audited weekly.
- The 3×/day owner stage-walkthroughs are replaced by the role rotation — the same ground covered by independent eyes.
- Releases integrate through the maintenance pipeline (see Operations): stage package → manifest → maintainer sign-offs → window publication under the hard deploy gate.
Pilot and rollout
Section titled “Pilot and rollout”The pilot trio passes the gate first (W3): anuka.pro Site, ANUKA Docs, ANUKA Dashboard — each with a roadmap v1 and a collaboration schema, one full rotation by all seven maintainers, and the first window integration under the new pipeline: Site + Docs pilot task #4066, Dashboard #4067. After the pilot, every live + connected product passes the gate in turn (Auth, Mentor, MCP, Foundation, ThinkTank, Founder, ChatGPT App, Launchpad, Admin, Design Hub, Podcasts); products still building (Team, Goals, Scale, DAO, Billing) enter as they connect Auth and the Widget.
Two exceptions stand outside the rotation: PEACH.talk (a client product with real users) and client projects in general (Alunai, JoyMap, SwagForge, SocialCapital) — they are not ANUKA products and ANUKA maintainers do not audit them.