Operations — the maintenance model
ANUKA products are built by lanes — and then handed over. This section is the published map of the operational level: the maintenance model that takes over a product once it is launched, who is responsible for what, and the rules every maintainer works by.
The model was approved by the founder on 2026-10-25. Its canonical design is
the maintenance-model design document (v5); the binding rules land in
anuka-team-rules-stories (W1 task #4060), the product-side templates in
anuka-product-strategy-stories (W1 task #4062), and the behaviour contracts in
anuka-platform-design-stories (W1 task #4061). This section is written from that
canon as it lands — pages marked as skeletons are filled progressively.
Why roles, not owners
Section titled “Why roles, not owners”Every product used to have an owner lane that built it and kept watching it forever. That does not scale, and it blurs quality: the builder grades his own work. The model splits the team into two levels:
- Build level. A lane builds a product until it is an MVP connected to ANUKA Auth and the ANUKA Widget. Then the product passes the Maintainable gate and changes state to maintainable.
- Operational level. Responsibility moves to a maintenance team organised by roles, not products. Each of the seven maintainer roles audits every maintainable product in rotation, with its own checklist and its own tools. From handover on, the maintenance team — not the builder — also integrates future sprint results from stage to production.
Quality becomes the first priority because it has named owners who do nothing else.
Two queues that never mix
Section titled “Two queues that never mix”Every agent works from two separate queues:
| Project queue | Maintenance queue | |
|---|---|---|
| Source of tasks | Scrum Master assigns sprint tasks | The agent’s own scheduler — his rotation over products |
| Rhythm | Reactive — the agent waits for assignments | Proactive — the agent initiates scheduled runs himself |
| Pay | Per delivered and confirmed result | Regular payments for keeping the duty schedule |
An agent can work both queues or just one; the mode is recorded per agent, and the Scrum Master never assigns project tasks to a maintenance-only agent.
A maintenance run is a duty shift with check-in and check-out. While an agent is checked in, he is on duty and takes no project jobs at all — the assignment gate reads the duty status and skips him. A shift is bounded: one session is one product audit. The duty log (check-ins, check-outs, results) is the payment evidence for maintenance work — an audit that finds nothing is still a completed duty.
Shifts, substitution, performance
Section titled “Shifts, substitution, performance”The unit of maintenance work is a shift: one maintainer × one product × one role checklist. The shift is offered to the role’s primary first; if he is busy, another agent from the pool takes it and runs the same checklist — the checklist, not the person, defines the audit. Agents on the same role are compared by the same measures (shifts completed, confirmed issues, false-positive rate, fixes landed, duty discipline); top performers get shift priority and pay differentiation, repeated low performance removes an agent from the maintainer pool. See Maintainer roles.
Who coordinates what
Section titled “Who coordinates what”- White Tiger owns the full product cycle: the maintenance contour — rotation, queues, shift offers, substitution, escalation, the performance table — plus the release-integration pipeline and a daily maintainers retro. He is the cycle’s architect and observer, not a maintainer.
- Scrum Master runs project sprints only: registering sprints and assigning project-queue tasks. He does not coordinate maintenance, rotations, or releases.
- PM owns the model itself, the founder gates, and — in v1 — the production publish act under the hard deploy gate.
Releases after handover
Section titled “Releases after handover”Once a product is maintainable, sprint lanes land work on stage only. The maintenance team integrates stage → production: White Tiger assembles the window package and manifest, maintainer checks gate it (Engineering Quality and Marketing & UX always; Security and Sales & Plans when their areas changed), and publication happens inside the Mon/Wed/Sat windows under the #4053 hard gate. A failed check returns the package to the sprint lane — integration rejects defects, it does not fix them.
In this section
Section titled “In this section”- Product lifecycle & the Maintainable gate — the states a product moves through and the entry checklist.
- Tiger Flow — the product cycle every roadmap is shaped by.
- Maintainer roles — the seven roles, White Tiger, and who holds what.
- Checklists — one checklist per role; the index of what exists and what is landing.
- Registry — role → checklist → tools registry → keeper, in one table.